Dilovası Efesanport Logistic Storage Building

Ortas Engineering was constructer for the structure which was built in order to be used as logistic vehicle parking of Efesan Group located at Dilovası port area. Ortas Engineering has delivered the project as turn-key including mechanical works and civil works. Total cost was approximately 12.000.000 TL.

The project which was started in 2014 has around 45.000 m² indoor areas. The structure was built on an asphalt ground free from soil material.
Location
:
DİLOVASI / KOCAELİ
Capacity
:
45.000 m2
Year
:
2014
Manufacturing Erection
:
Turnkey

Dilovası Efesanport Logistic Storage Building

Ortas Engineering was constructer for the structure which was built in order to be used as logistic vehicle parking of Efesan Group located at Dilovası port area. Ortas Engineering has delivered the project as turn-key including mechanical works and civil works. Total cost was approximately 12.000.000 TL.

The project which was started in 2014 has around 45.000 m² indoor areas. The structure was built on an asphalt ground free from soil material.
Location
:
DİLOVASI / KOCAELİ
Capacity
:
45.000 m2
Year
:
2014
Manufacturing Erection
:
Turnkey

Dilovası Efesanport Logistic Storage Building

Ortas Engineering was constructer for the structure which was built in order to be used as logistic vehicle parking of Efesan Group located at Dilovası port area. Ortas Engineering has delivered the project as turn-key including mechanical works and civil works. Total cost was approximately 12.000.000 TL.

The project which was started in 2014 has around 45.000 m² indoor areas. The structure was built on an asphalt ground free from soil material.
Location
DİLOVASI / KOCAELİ
Capacity
45.000 m2
Year
2014
Manufacturing Erection
Turnkey

Dilovası Efesanport Logistic Storage Building

Ortas Engineering was constructer for the structure which was built in order to be used as logistic vehicle parking of Efesan Group located at Dilovası port area. Ortas Engineering has delivered the project as turn-key including mechanical works and civil works. Total cost was approximately 12.000.000 TL.

The project which was started in 2014 has around 45.000 m² indoor areas. The structure was built on an asphalt ground free from soil material.
Location
:
DİLOVASI / KOCAELİ
Capacity
:
45.000 m2
Year
:
2014
Manufacturing Erection
:
Turnkey